Planning near you · Tipperary · Ref 2660709
A development which will consist of the construction of a residential development of…
Lands at Crann Ard and Glencarra Estates , Fethard Road , Clonmel
Incompleted Application
- Applicant
- Not supplied in our sources
- Proposed use
- See council description
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
- Application received
Source: NPAD
NPAD · legacy batch; original response hash unavailable · field: received_date
What changed
Updated in the retained record: Source status, Decision due date, Proposal description.
Compare the previous and updated values
Source status: PRE_VALIDATION → INCOMPLETED APPLICATION; Decision due date: 2026-09-14 → not supplied; Proposal description: development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction → a development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction
Legacy batch date (exact collection time unavailable): 29 July 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns Lands at Crann Ard and Glencarra Estates , Fethard Road , Clonmel. Proposal excerpt: “a development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3…”
The source records zero homes despite housing wording. Do not use this as a verified housing total.
Location & nearby applications
Lands at Crann Ard and Glencarra Estates , Fethard Road , Clonmel
No usable coordinates are available in the retained record, so a map pin is not shown.
Documents & sources
Tipperary County Council · Reference 2660709
View council file →Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.
Source records and verification details
Change record: NPAD · legacy batch; original response hash unavailable
Proposal: NPAD · legacy batch; original response hash unavailable
Latest source observation retained: 2026-07-29T00:00:00+00:00. Source dataset date: not supplied.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-07-29
- Source status: PRE_VALIDATION → INCOMPLETED APPLICATION
- decision due date: 2026-09-14 →
- Proposal description: development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction → a development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.