Search
localnews.ie

Irish local news and public records

Planning near you · Tipperary · Ref 2660540

A power plant comprising the following main components; Engine Hall comprising up to…

Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel

New Application

Applicant
Not supplied in our sources
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Application received
    Source: NPAD

    NPAD · source SHA-256: 25bde9339856909e1991e8481a77a92969d081144022fdc4eb389d79764fb931 · field: ReceivedDate

  2. Further information requested
    Source: NPAD

    NPAD · source SHA-256: 25bde9339856909e1991e8481a77a92969d081144022fdc4eb389d79764fb931 · field: FIRequestDate

  3. Further information received
    Source: NPAD

    NPAD · source SHA-256: 25bde9339856909e1991e8481a77a92969d081144022fdc4eb389d79764fb931 · field: FIRecDate

What changed

Updated in the retained record: Further information received.

Compare the previous and updated values

Further information received: 2026-09-18 → 2026-09-14

Observed: 30 September 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel. Proposal excerpt: “a power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex …”

The source records zero homes despite housing wording. Do not use this as a verified housing total.

Location & nearby applications

Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel

The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.

Nearby applications

Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.

Documents & sources

Tipperary County Council · Reference 2660540

View council file →
Source records and verification details

Change record: NPAD · source SHA-256: 25bde9339856909e1991e8481a77a92969d081144022fdc4eb389d79764fb931

Proposal: NPAD · source SHA-256: 25bde9339856909e1991e8481a77a92969d081144022fdc4eb389d79764fb931

Latest source observation retained: 2026-09-30T08:57:42.622070+00:00. Source dataset date: 2026-09-29.

Full description from the council file
a power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Tank Farm comprising: 2 x Fuel Oil Storage Tanks, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Standby Generators; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank; Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services. The plant is subject to a pollution control licence from the EPA
Application details
Reference
2660540
Site address
Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel
Homes in source field
0 (proposal, not completions)
Reported floor area (m²)
0
Application type
PERMISSION
Latest reported outcome
New Application
Date received
June 03, 2026
Decision due
October 15, 2026
Authority
Tipperary County Council
All recorded updates to this application

Dates below show when a change was first retained, not when a planning event happened.

  1. 2026-06-17
    • Proposal description: the power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Tank Farm comprising: 2 x Fuel Oil Storage Tanks, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Standby Generators; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank; Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services. The plant is subject to a pollution control licence from the EPA → a power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Tank Farm comprising: 2 x Fuel Oil Storage Tanks, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Standby Generators; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank; Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services. The plant is subject to a pollution control licence from the EPA
    • Site address: Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel Co. Tipperary → Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel
  2. 2026-09-23
    • decision due date: 2026-07-28 → 2026-10-15
  3. 2026-09-30
    • Further information received: 2026-09-18 → 2026-09-14

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.

→ More from Clonmel