Planning near you · Waterford · Ref 2660542
Development at Fenor Pig Farm, Matthewstown, Fenor, County Waterford(within the…
Fenor Pig Farm , Matthewstown , Fenor County Waterford (within the townland of Matthewstown)
Further Information
- Applicant
- Not supplied in our sources
- Proposed use
- See council description
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
What changed
Updated in the retained record: Source status, Decision due date.
Compare the previous and updated values
Source status: NEW APPLICATION → FURTHER INFORMATION; Decision due date: 2026-09-14 → not supplied
Observed: 21 September 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns Fenor Pig Farm , Matthewstown , Fenor County Waterford (within the townland of Matthewstown). Proposal excerpt: “development at Fenor Pig Farm, Matthewstown, Fenor, County Waterford(within the townland of Matthewstown), on a site of approximately 18.75 hectares. The proposed development will consist of the expansion, upgrade and mo…”
The source records zero homes despite housing wording. Do not use this as a verified housing total.
Location & nearby applications
Fenor Pig Farm , Matthewstown , Fenor County Waterford (within the townland of Matthewstown)
The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.
Nearby applications
Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.
- solar energy development to erect 292.32 kWp of photovoltaic panels on ground mounted steel frames with all associated site w…
- the following works to our existing school, comprising the construction of a new single storey ASD Unit extension consisting…
- 2 no. 2 storey dormer houses, alterations to existing site boundary, new vehicular entrances, carparking and all associated d…
- for a Change of Design of the Dwelling relative to that previously granted under Planning Application 22/597. The Change of D…
- for renovation and single storey extension of an existing single storey dwelling, new site entrance, wastewater treatment sys…
Documents & sources
Waterford City and County Council · Reference 2660542
View council file →- Acknowledgement / Validation Letter
- Application - Cover Letter
- Application Form - Part A
- Confirmation of EIAR from Department
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- EIAR
- Elevations
- Elevations
- F.I. Request Letter
- Newspaper Notice
- NIS
- Other Assessments
- Other Assessments
- Other Assessments
- Other Assessments
- Other Assessments
- Photo Montage
- Photo Montage
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Report Received from External Body
- Report Received from External Body
- Report Received from External Body
- Report Received from External Body
- Report Request Letter to External Body
- Report Request Letter to Internal Staff
- Site layout plan
- Site layout plan
- Site location map
- Site Notice
- Submission
- Submission
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Submission Acknowledgment
- Validation Check List
Source records and verification details
Change record: NPAD · source SHA-256: f97fea6c9ff14033
Proposal: NPAD · source SHA-256: f97fea6c9ff14033
Latest source observation retained: 2026-09-21T10:03:12.282119+00:00. Source dataset date: 2026-09-15.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-08-12
- Source status: PRE_VALIDATION → NEW APPLICATION
- Proposal description: We, Fenor Pig Farms Ltd., intend to apply for planning permission for development at Fenor Pig Farm, Matthewstown, Fenor, County Waterford(within the townland of Matthewstown), on a site of approximately 18.75 hectares. The proposed development will consist of the expansion, upgrade and modernisation of an existing EPA licensed pig rearing installation (Licence Ref. P0410-01) as follows: • Construction of 1 no. single-storey pig fattening house (Building 511, maximum height c. 4.5m above ground level) with a gross floor area of approximately 3,763sqm (approximately 106m in length × 35.5m in width overall, including covered walkway), including associated feed storage silos, accommodating approximately 3,698 production pigs; • Provision of roof structures to existing whey storage tanks (Area 802) with a maximum height of approximately 5.93m to 8.99m above ground level; • Decommissioning of the existing open slurry lagoon (Structure 955), including emptying and removal of the existing concrete structure, reinstatement of suitable excavated material on site and removal of any contaminated material, and the construction of 2 no. covered overground slurry storage tanks, comprising: o 1 no. tank (Structure 951) with a capacity of approximately 5,236m³ and an overall height of approximately 7.3m above ground level; and o 1 no. tank (Structure 963) with a capacity of approximately 1,428m³and an overall height of approximately 6.0m above ground level; • Provision of 1 no. single-storey dry store building with a floor area of approximately 531sqm and an overall height of approximately 9.83m above ground level; • Provision of a truck wash and wheel wash facility, including associated drainage infrastructure, silt trap and hydrocarbon interceptor; • Installation of slurry handling infrastructure serving the proposed pig fattening house (Building 511), including automatic scraper systems, channels, pumps, sumps and abstraction points; • Implementation of emission control measures, including the upgrade and conversion of Buildings 503–510 from natural to mechanical ventilation and modifications to ventilation infrastructure, including an increase in stack height at Building 204; • Installation of 3 no. new monitoring boreholes and 1 no. new on-site groundwater abstraction (production) well; • Provision of ancillary infrastructure including covered whey storage tanks, a designated carcass storage and collection area incorporating sealed andand cov → development at Fenor Pig Farm, Matthewstown, Fenor, County Waterford(within the townland of Matthewstown), on a site of approximately 18.75 hectares. The proposed development will consist of the expansion, upgrade and modernisation of an existing EPA licensed pig rearing installation (Licence Ref. P0410-01) as follows: • Construction of 1 no. single-storey pig fattening house (Building 511, maximum height c. 4.5m above ground level) with a gross floor area of approximately 3,763sqm (approximately 106m in length × 35.5m in width overall, including covered walkway), including associated feed storage silos, accommodating approximately 3,698 production pigs; • Provision of roof structures to existing whey storage tanks (Area 802) with a maximum height of approximately 5.93m to 8.99m above ground level; • Decommissioning of the existing open slurry lagoon (Structure 955), including emptying and removal of the existing concrete structure, reinstatement of suitable excavated material on site and removal of any contaminated material, and the construction of 2 no. covered overground slurry storage tanks, comprising: o 1 no. tank (Structure 951) with a capacity of approximately 5,236m³ and an overall height of approximately 7.3m above ground level; and o 1 no. tank (Structure 963) with a capacity of approximately 1,428m³and an overall height of approximately 6.0m above ground level; • Provision of 1 no. single-storey dry store building with a floor area of approximately 531sqm and an overall height of approximately 9.83m above ground level; • Provision of a truck wash and wheel wash facility, including associated drainage infrastructure, silt trap and hydrocarbon interceptor; • Installation of slurry handling infrastructure serving the proposed pig fattening house (Building 511), including automatic scraper systems, channels, pumps, sumps and abstraction points; • Implementation of emission control measures, including the upgrade and conversion of Buildings 503–510 from natural to mechanical ventilation and modifications to ventilation infrastructure, including an increase in stack height at Building 204; • Installation of 3 no. new monitoring boreholes and 1 no. new on-site groundwater abstraction (production) well; • Provision of ancillary infrastructure including covered whey storage tanks, a designated carcass storage and collection area incorporating sealed andand covered bio-secure storage, upgrades to internal roadways and yard areas
- 2026-09-21
- Source status: NEW APPLICATION → FURTHER INFORMATION
- decision due date: 2026-09-14 →