Planning near you · Dublin · Ref WEBLRD6072/24-S304

7. The following Environmental Health Section requirements of the Planning Authority…

Hartfield Place, Swords Road, Whitehall, Dublin 9, D09 C7F8

Status unknown

Applicant
EW Property Ltd
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Grant recorded
    Source: Council portal

    Council portal · source SHA-256: bca8308349600e60ca97024574e50fc1d3d4f28bae70cd56642ecd19bf9a9587 · field: finalGrantDate

  2. Application registered
    Source: Council portal

    Council portal · source SHA-256: bca8308349600e60ca97024574e50fc1d3d4f28bae70cd56642ecd19bf9a9587 · field: registrationDate

What changed

First retained observation; this does not establish that the application is new.

Observed: 21 September 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns Hartfield Place, Swords Road, Whitehall, Dublin 9, D09 C7F8. Proposal excerpt: “7. The following Environmental Health Section requirements of the Planning Authority shall be complied with: (i) A Construction Management Plan shall be included as part of this application prepared by the awarded contra…” Demolition is included in the proposal description.

Location & nearby applications

Hartfield Place, Swords Road, Whitehall, Dublin 9, D09 C7F8

No usable coordinates are available in the retained record, so a map pin is not shown.

Documents & sources

Dublin City Council · Reference WEBLRD6072/24-S304

View council file →

Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.

Source records and verification details

Change record: Council portal · source SHA-256: bca8308349600e60ca97024574e50fc1d3d4f28bae70cd56642ecd19bf9a9587

Proposal: Council portal · source SHA-256: bca8308349600e60ca97024574e50fc1d3d4f28bae70cd56642ecd19bf9a9587

Latest source observation retained: 2026-09-21T10:16:56.089118+00:00. Source dataset date: not supplied.

Full description from the council file
7. The following Environmental Health Section requirements of the Planning Authority shall be complied with: (i) A Construction Management Plan shall be included as part of this application prepared by the awarded contractor. This plan shall be developed with reference to the Air Quality Monitoring and Noise Control Unit’s Good Practice Guide for Construction and Demolition produced by the Air Quality Monitoring and Noise Control Unit of Dublin City Council. This unit requires that the measures for “High Risk” sites contained in the Air Quality Monitoring and Noise Control Unit’s Good Practice Guide for Construction and Demolition be added to the measures contained in the Construction management Plan, or a signed statement on head of paper submitted on behalf of the awarded contractor, stating adherence to measures for high risk sites contained within the document. This shall be submitted to the Air Quality Monitoring & Noise Control Unit for reviewing before works commence. Any dust monitoring onsite shall be real-time dust monitoring, as opposed to the Bergerhoff method. This is contained within the guidance document above. (ii) Due to the proximity to local residents and other sensitive receptors such as Highfield Hospital to the south and Beechlawn Nursing home to the east and the likely use of generators to provide power to the cranes, this unit would recommend placing generators at the least intrusive location. This unit also recommends these generators have acoustic barriers/enclosures built around them in order to reduce sound levels at the nearest noise sensitive receptors. This shall be included within the Construction Management Plan for the site. (iii) The hours of operation during the demolition and construction phase shall be restricted to 7.00am to 6pm, Monday to Friday, and 8.00am to 2.00pm on Saturdays. Permission to work outside of these hours must be subject to the approval of Dublin City Council (B) Noise Control Recommended Conditions and Comments regarding retail/cafe units (i) The LAeq level measured over 15 minutes (daytime) or 5 minutes (nighttime) at a noise sensitive premises when plant is operating shall not exceed the LA90 (15 minutes day or 5 minutes night),by 5 decibels or more, measured from the same position, under the same conditions and during a comparable period with no plant in operation. (ii) Noise levels should not be so loud, so continuous, so repeated, of such duration or pitch or occurring at such times as to give reasonable cause for annoyance to a person in any premises in the neighbourhood or to a person lawfully using any public place. (C) Air Quality Control –General Recommended Conditions and Comments regarding retail/cafe units (i) All emissions to air associated with the development must be free from offensive odour and shall not result in an impairment of or an interference with amenities or the environment. (ii) A suitably qualified and experienced person should undertake the design and installation of the ventilation system (iii) A suitable filtration system must be installed to neutralise odours prior to their discharge (iv) The ventilation/extraction systems should be designed and be so sited to ensure the emissions will cause no nuisance.
Application details
Reference
WEBLRD6072/24-S304
Applicant
EW Property Ltd
Site address
Hartfield Place, Swords Road, Whitehall, Dublin 9, D09 C7F8
Decision due
November 06, 2026
Authority
Dublin City Council

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.