Planning near you · Donegal · Ref 2661260
A PERIOD OF 10 YEARS FOR A LONG DURATION ENERGY STORAGE FACILITY WHICH WILL CONSIST…
CROCKAHENNY, INISHOWEN, CO. DONEGAL
Final grant
Council decision recorded: August 21, 2026
- Applicant
- CROCKAHENNY WINDFARM DAC
- Proposed use
- See council description
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
- Application received
Source: NPAD
NPAD · source SHA-256:
1f62bd35489433e2· field: ReceivedDatea5293c93a19f744c cf644cdd39c97e53 8119f2b1b60cbe71 - Council decisionGranted with conditions
Source: NPAD
NPAD · source SHA-256:
1f62bd35489433e2· field: DecisionDatea5293c93a19f744c cf644cdd39c97e53 8119f2b1b60cbe71 - Grant recorded
Source: NPAD
NPAD · source SHA-256:
1f62bd35489433e2· field: GrantDatea5293c93a19f744c cf644cdd39c97e53 8119f2b1b60cbe71
Other referenced or similar applications
These links do not merge applications or establish that one replaces another.
What changed
Updated in the retained record: Source status, Grant recorded.
Compare the previous and updated values
Source status: DECISION MADE → APPLICATION FINALISED; Grant recorded: not supplied → 2026-09-23
Observed: 30 September 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns CROCKAHENNY , INISHOWEN , CO. DONEGAL. Proposal excerpt: “A PERIOD OF 10 YEARS FOR A LONG DURATION ENERGY STORAGE FACILITY WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. ENERGY STORAGE SYSTEM COMPOUND CONTAINING ENERGY STORAGE CONTAINERS, CONN…”
Sources disagree on some fields. The latest reported value is shown; differences require review.
Location & nearby applications
CROCKAHENNY , INISHOWEN , CO. DONEGAL
The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.
Nearby applications
Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.
- A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF…
- ERECTION OF A DWELLING, INSTALLATION OF TREATMENT PLANT AND ALL ASSOCIATED SITE WORKS
- ERECTION OF DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASS…
- CONSTRUCTION OF A TWO STOREY DWELLING WITH WASTEWATER TREATMENT PLANT AND PERCOLATION AREA, TOGETHER WITH A SINGLE STOREY DOM…
- CONSTRUCTION OF A NEW SINGLE STOREY DWELLING, INSTALLATION OF PROPOSED NEW WASTEWATER TREATMENT PLANT AND PERCOLATION AREA TO…
Documents & sources
Donegal County Council · Reference 2661260
View council file →Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.
Source records and verification details
Change record: NPAD · source SHA-256: 1f62bd35489433e2
Proposal: NPAD · source SHA-256: 1f62bd35489433e2
Latest source observation retained: 2026-09-30T08:12:03.191838+00:00. Source dataset date: 2026-09-29.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-09-16
- Source status: NEW APPLICATION → DECISION MADE
- Council outcome: → CONDITIONAL
- Council decision: → 2026-08-21
- decision due date: 2026-08-31 → 2027-08-11
- 2026-09-30
- Source status: DECISION MADE → APPLICATION FINALISED
- Grant recorded: → 2026-09-23
Source differences
- Source status: {"ePlan": "DECISION MADE", "NPAD": "APPLICATION FINALISED"}
- Proposal description: {"ePlan": "A PERIOD OF 10 YEARS FOR A LONG DURATION ENERGY STORAGE FACILITY WHICH WILL CONSIST OF THE FOLLOWING...", "NPAD": "A PERIOD OF 10 YEARS FOR A LONG DURATION ENERGY STORAGE FACILITY WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. ENERGY STORAGE SYSTEM COMPOUND CONTAINING ENERGY STORAGE CONTAINERS, CONNECTED TO THE NATIONAL GRID SYSTEM VIA C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)"}
- Site address: {"ePlan": "CROCKAHENNY INISHOWEN CO. DONEGAL", "NPAD": "CROCKAHENNY , INISHOWEN , CO. DONEGAL"}
- detail_url: {"ePlan": "https://www.eplanning.ie/DonegalCC/AppFileRefDetails/2661260/0", "NPAD": "http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2661260/0"}
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.