localnews.ie

Irish local news and public records

Planning near you · Donegal · Ref 2661220

A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING…

CROCKAHENNY, INISHOWEN, CO. DONEGAL

Final grant

Council decision recorded: August 21, 2026

Applicant
CROCKAHENNY WINDFARM DAC
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Application received
    Source: NPAD

    NPAD · source SHA-256: 1abf16e1cc40d04cb01f217d074803ed8c21d2fc7b6e6559ce3618774f5a3822 · field: ReceivedDate

  2. Council decisionGranted with conditions
    Source: NPAD

    NPAD · source SHA-256: 1abf16e1cc40d04cb01f217d074803ed8c21d2fc7b6e6559ce3618774f5a3822 · field: DecisionDate

  3. Grant recorded
    Source: NPAD

    NPAD · source SHA-256: 1abf16e1cc40d04cb01f217d074803ed8c21d2fc7b6e6559ce3618774f5a3822 · field: GrantDate

Other referenced or similar applications

These links do not merge applications or establish that one replaces another.

What changed

Updated in the retained record: Source status, Grant recorded.

Compare the previous and updated values

Source status: DECISION MADE → APPLICATION FINALISED; Grant recorded: not supplied → 2026-09-23

Observed: 30 September 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns CROCKAHENNY , INISHOWEN , CO. DONEGAL. Proposal excerpt: “A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. NEW 38KV SUBSTATION, INCLUDING A NEW 38KV BUILDING AND COMPOUND, 38KV ESB LINE BAY, RELO…”

Sources disagree on some fields. The latest reported value is shown; differences require review.

Location & nearby applications

CROCKAHENNY , INISHOWEN , CO. DONEGAL

The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.

Nearby applications

Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.

Documents & sources

Donegal County Council · Reference 2661220

View council file →

Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.

Source records and verification details

Change record: NPAD · source SHA-256: 1abf16e1cc40d04cb01f217d074803ed8c21d2fc7b6e6559ce3618774f5a3822

Proposal: NPAD · source SHA-256: 1abf16e1cc40d04cb01f217d074803ed8c21d2fc7b6e6559ce3618774f5a3822

Latest source observation retained: 2026-09-30T08:12:02.443751+00:00. Source dataset date: 2026-09-29.

Full description from the council file
A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. NEW 38KV SUBSTATION, INCLUDING A NEW 38KV BUILDING AND COMPOUND, 38KV ESB LINE BAY, RELOCATION OF THE EXISTING 38KV CABLE MAST, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION AND 38KV LINE, C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, ELECTRICAL EQUIPMENT, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
Application details
Reference
2661220
Applicant
CROCKAHENNY WINDFARM DAC
Site address
CROCKAHENNY, INISHOWEN, CO. DONEGAL
Homes in source field
0 (proposal, not completions)
Reported floor area (m²)
0
Application type
PERMISSION
Latest reported outcome
Final grant
Date received
July 01, 2026
Decision due
August 11, 2027
Council decision date
August 21, 2026
Authority
Donegal County Council
All recorded updates to this application

Dates below show when a change was first retained, not when a planning event happened.

  1. 2026-09-16
    • Source status: NEW APPLICATION → DECISION MADE
    • Council outcome: → CONDITIONAL
    • Council decision: → 2026-08-21
    • decision due date: 2026-08-25 → 2027-08-11
  2. 2026-09-30
    • Source status: DECISION MADE → APPLICATION FINALISED
    • Grant recorded: → 2026-09-23
Source differences
  • Source status: {"ePlan": "DECISION MADE", "NPAD": "APPLICATION FINALISED"}
  • Proposal description: {"ePlan": "A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INST...", "NPAD": "A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. NEW 38KV SUBSTATION, INCLUDING A NEW 38KV BUILDING AND COMPOUND, 38KV ESB LINE BAY, RELOCATION OF THE EXISTING 38KV CABLE MAST, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION AND 38KV LINE, C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, ELECTRICAL EQUIPMENT, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)"}
  • Site address: {"ePlan": "CROCKAHENNY INISHOWEN CO. DONEGAL", "NPAD": "CROCKAHENNY , INISHOWEN , CO. DONEGAL"}
  • detail_url: {"ePlan": "https://www.eplanning.ie/DonegalCC/AppFileRefDetails/2661220/0", "NPAD": "http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2661220/0"}

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.