Planning near you · Mayo · Ref 2660480
The Application will replace the previous consented (but unbuilt) BESS facility granted…
SSE Thermal Tawnaghmore Power Station, Tawnaghmore Upper, Killala Co. Mayo
Final grant
Council decision recorded: August 11, 2026
- Applicant
- SSE Renewables Ireland Ltd
- Proposed use
- See council description
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
- Application received
Source: NPAD
NPAD · source SHA-256:
5b73ddf6bd85fa9b· field: ReceivedDatee3711591e4edf0cf afffafbad24602fe e227d773e20fd62f - Council decisionGranted with conditions
Source: NPAD
NPAD · source SHA-256:
5b73ddf6bd85fa9b· field: DecisionDatee3711591e4edf0cf afffafbad24602fe e227d773e20fd62f - Grant recorded
Source: NPAD
NPAD · source SHA-256:
5b73ddf6bd85fa9b· field: GrantDatee3711591e4edf0cf afffafbad24602fe e227d773e20fd62f
What changed
Updated in the retained record: Source status, Council outcome, Council decision.
Compare the previous and updated values
Source status: NEW APPLICATION → DECISION MADE; Council outcome: not supplied → CONDITIONAL; Council decision: not supplied → 2026-08-11
Legacy batch date (exact collection time unavailable): 22 August 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns SSE Thermal Tawnaghmore Power Station , Tawnaghmore Upper , Killala Co. Mayo. Proposal excerpt: “The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108). The development will consist of the following elements: • BESS facility including battery containers …”
Sources disagree on some fields. The latest reported value is shown; differences require review.
Location & nearby applications
SSE Thermal Tawnaghmore Power Station , Tawnaghmore Upper , Killala Co. Mayo
The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.
Nearby applications
Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.
- The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29…
- construct 68 no. x 585w ground mounted solar panels, an over ground slurry storage silo and all associated site works, Retent…
- retain side elevation as built to existing house together with all ancillary site works and services
- construct a dwelling house and septic tank/ proprietary effluent treatment system together with all ancillary site works and…
- The application will consist of planning permission to (1) Demolish existing extension, (2) Construct new extensions and alte…
Documents & sources
Mayo County Council · Reference 2660480
View council file →- Acknowledgement / Validation Letter
- Application - Cover Letter
- Application Form - Part A
- Drainage Network Drawings
- Drainage Network Drawings
- Drainage Network Drawings
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- Drawings - General
- EIAR
- Final Grant
- Habitat Directive Screening Report
- Land owner consent
- Land owner consent
- Newspaper Notice
- Notification of Decision
- Notification of Decision Letter to third parties
- Other Assessments
- Other Assessments
- Other Assessments
- Other Assessments
- Other Assessments
- Planners Report
- Planners Report
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Plans, Sections, Elevations
- Pre-Planning Details
- Report Received from Internal Staff
- Report Received from Internal Staff
- Report Request Letter to External Body
- Site assessment report
- Site layout plan
- Site layout plan
- Site layout plan
- Site layout plan
- Site layout plan
- Site layout plan
- Site layout plan
- Site layout plan
- Site layout plan
- Site location map
- Site location map
- Site location map
- Site location map
- Site Notice
- Site Notice
- Validation Check List
Source records and verification details
Change record: ePlan · legacy batch; original response hash unavailable
Proposal: NPAD · source SHA-256: 5b73ddf6bd85fa9b
Latest source observation retained: 2026-09-30T08:14:05.435374+00:00. Source dataset date: 2026-09-29.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-08-22
- Source status: NEW APPLICATION → DECISION MADE
- Council outcome: → CONDITIONAL
- Council decision: → 2026-08-11
Source differences
- Source status: {"ePlan": "DECISION MADE", "NPAD": "APPLICATION FINALISED"}
- Proposal description: {"ePlan": "The Application will replace the previous consented (but unbuilt) BESS facility granted under planni...", "NPAD": "The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108).\r\nThe development will consist of the following elements: \r\n•\tBESS facility including battery containers with integrated HVAC (heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, CCTV and perimeter fencing;\r\n•\tAssociated Electrical Compound consisting of a Low Voltage Operations Independent Power Producer (IPP) Compound including a single storey control and operations building, switchgear room, storage container, car parking, welfare/office facilities;\r\n•\tHigh voltage electrical yard and Eirgrid 110kV substation building; \r\n•\t264 meters long 110kV single circuit underground grid connection (UGC) within SSE lands and 119 meters within the existing ESB 110kV Substation lands to facilitate the grid connection to the existing adjacent Tawnaghmore substation;\r\n•\tProposed internal access tracks to BESS facility, including 4 no. new gate entrances\r\n•\tReinforced concrete and retaining walls;\r\n•\tA temporary construction compound and associated temporary infrastructure to facilitate the development;\r\n•\tAssociated landscaping, drainage, decommissioning of existing septic tank and ancillary works. \r\nA 10-year permission is sought in respect of the development.\r\nCertain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application.\r\nThe Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02)."}
- Site address: {"ePlan": "SSE Thermal Tawnaghmore Power Station Tawnaghmore Upper Killala, Co. Mayo", "NPAD": "SSE Thermal Tawnaghmore Power Station , Tawnaghmore Upper , Killala Co. Mayo"}
- detail_url: {"ePlan": "https://www.eplanning.ie/MayoCC/AppFileRefDetails/2660480/0", "NPAD": "http://www.eplanning.ie/MayoCC/AppFileRefDetails/2660480/0"}
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.