Search
localnews.ie

Irish local news and public records

Planning near you · Longford · Ref 2660261

RED III application for a 10 Year Planning Permission with an operational lifespan…

Commons North Gorteengar Tullyvrane Knock Lisrevagh , Rathcline Lisnacush Carrigeens , Carrowroe and Aghaloughan

New Application

Applicant
BNRG Carrowroe Limited
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Application received
    Source: NPAD

    NPAD · source SHA-256: 251962e6046582010e99c3fa3b52fde3917e2c231a25b6bfcda81925f1b7314b · field: ReceivedDate

What changed

Updated in the retained record: Source status, Proposal description, Site address.

Compare the previous and updated values

Source status: PRE-VALIDATION → NEW APPLICATION; Proposal description: a 10 Year Planning Permission with an operational lifespan of 40 years, for development in the townl... → RED III application for a 10 Year Planning Permission with an operational lifespan of 40 years, for ...; Site address: Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh, Rathcline, Lisnacush, Carrigeens, Carrowroe and Aghaloughan, Co. Longford → Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh Rathcline, Lisnacush, Carrigeens Carrowroe and Aghaloughan Co. Longford

Legacy batch date (exact collection time unavailable): 26 August 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns Commons North Gorteengar Tullyvrane Knock Lisrevagh , Rathcline Lisnacush Carrigeens , Carrowroe and Aghaloughan. Proposal excerpt: “RED III application for a 10 Year Planning Permission with an operational lifespan of 40 years, for development in the townlands of, Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh, Rathcline, Lisnacush, Carrigee…”

Sources disagree on some fields. The latest reported value is shown; differences require review.

Location & nearby applications

Commons North Gorteengar Tullyvrane Knock Lisrevagh , Rathcline Lisnacush Carrigeens , Carrowroe and Aghaloughan

The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.

Nearby applications

Closest retained records in this county within 5 km, measured between map points. Proximity does not establish a shared site.

Documents & sources

Longford County Council · Reference 2660261

View council file →
Source records and verification details

Change record: ePlan · legacy batch; original response hash unavailable

Proposal: NPAD · source SHA-256: 251962e6046582010e99c3fa3b52fde3917e2c231a25b6bfcda81925f1b7314b

Latest source observation retained: 2026-09-23T08:14:45.146577+00:00. Source dataset date: 2026-09-22.

Full description from the council file
RED III application for a 10 Year Planning Permission with an operational lifespan of 40 years, for development in the townlands of, Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh, Rathcline, Lisnacush, Carrigeens, Carrowroe and Aghaloughan, County Longford. The grid connection route (subject to a separate future planning application to An Coimisiún Pleanála) will be in the townlands of Aghamore and Lanesborough. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application is subject to a completeness check under section 37JA of the Planning and Development Act 2000, as amended by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The development consists of: a solar farm with a total area of circa 146.93 ha. The proposed solar farm development spans a total site area measuring circa 96.3ha. The export capacity to the grid is estimated to be up to 85 MW. The proposed development will consist of a solar farm comprising of: • Installation of approximately 49.1 ha (approximately 910,650 sqm solar PV panel arrays, to include approximately 491,270 sqm of ground-mounted panels supported by steel frame structures, and the remaining area as solar array row spacing. • Construction of 24 MV stations. • A 110 kV on-site substation (0.7 ha) and approximately 1.7 km of underground cabling to connect to the national grid (subject to a separate future planning application to An Coimisiún Pleanála). The grid connection route will be in the townlands of Aghamore and Lanesborough. • Installation of underground cabling and ducting, comprising approximately 3.13 km along the public roads R392, L1168, L5264 and L1164. • Provision of two temporary site compounds, welfare facilities and materials storage areas. • Provision of seven temporary laydown areas for materials storage and welfare units (portaloos). • Construction of approximately 8.9 km of internal access tracks throughout the site. • Erection of 19 no. pole mounted, inward facing CCTV cameras for site monitoring across the proposed development. • Construction and operational access via existing entrances on
Application details
Reference
2660261
Applicant
BNRG Carrowroe Limited
Site address
Commons North Gorteengar Tullyvrane Knock Lisrevagh , Rathcline Lisnacush Carrigeens , Carrowroe and Aghaloughan
Homes in source field
0 (proposal, not completions)
Reported floor area (m²)
0
Application type
PERMISSION
Latest reported outcome
New Application
Date received
August 19, 2026
Decision due
October 13, 2026
Authority
Longford County Council
All recorded updates to this application

Dates below show when a change was first retained, not when a planning event happened.

  1. 2026-08-26
    • Source status: PRE-VALIDATION → NEW APPLICATION
    • Proposal description: a 10 Year Planning Permission with an operational lifespan of 40 years, for development in the townl... → RED III application for a 10 Year Planning Permission with an operational lifespan of 40 years, for ...
    • Site address: Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh, Rathcline, Lisnacush, Carrigeens, Carrowroe and Aghaloughan, Co. Longford → Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh Rathcline, Lisnacush, Carrigeens Carrowroe and Aghaloughan Co. Longford
Source differences
  • Proposal description: {"ePlan": "RED III application for a 10 Year Planning Permission with an operational lifespan of 40 years, for ...", "NPAD": "RED III application for a 10 Year Planning Permission with an operational lifespan of 40 years, for development in the townlands of, Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh, Rathcline, Lisnacush, Carrigeens, Carrowroe and Aghaloughan, County Longford. The grid connection route (subject to a separate future planning application to An Coimisiún Pleanála) will be in the townlands of Aghamore and Lanesborough. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application is subject to a completeness check under section 37JA of the Planning and Development Act 2000, as amended by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The development consists of: a solar farm with a total area of circa 146.93 ha. The proposed solar farm development spans a total site area measuring circa 96.3ha. The export capacity to the grid is estimated to be up to 85 MW. The proposed development will consist of a solar farm comprising of: \r\n• Installation of approximately 49.1 ha (approximately 910,650 sqm solar PV panel arrays, to include approximately 491,270 sqm of ground-mounted panels supported by steel frame structures, and the remaining area as solar array row spacing. •\tConstruction of 24 MV stations. • A 110 kV on-site substation (0.7 ha) and approximately 1.7 km of underground cabling to connect to the national grid (subject to a separate future planning application to An Coimisiún Pleanála). The grid connection route will be in the townlands of Aghamore and Lanesborough. •\tInstallation of underground cabling and ducting, comprising approximately 3.13 km along the public roads R392, L1168, L5264 and L1164. • Provision of two temporary site compounds, welfare facilities and materials storage areas. •\tProvision of seven temporary laydown areas for materials storage and welfare units (portaloos). •\tConstruction of approximately 8.9 km of internal access tracks throughout the site. •\tErection of 19 no. pole mounted, inward facing CCTV cameras for site monitoring across the proposed development. •\tConstruction and operational access via existing entrances on"}
  • Site address: {"ePlan": "Commons North, Gorteengar, Tullyvrane, Knock, Lisrevagh Rathcline, Lisnacush, Carrigeens Carrowroe and Aghaloughan Co. Longford", "NPAD": "Commons North Gorteengar Tullyvrane Knock Lisrevagh , Rathcline Lisnacush Carrigeens , Carrowroe and Aghaloughan"}
  • detail_url: {"ePlan": "https://www.eplanning.ie/LongfordCC/AppFileRefDetails/2660261/0", "NPAD": "http://www.eplanning.ie/LongfordCC/AppFileRefDetails/2660261/0"}

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.