Search
localnews.ie

Irish local news and public records

Planning near you · Kilkenny · Ref 2660246

We, ART Generation Limited, intend to apply for a 10-Year planning permission for…

Ballytobin, Co. Kilkenny, Ireland

Incompleted Application

Applicant
Art Generation Limited
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Application received
    Source: NPAD

    NPAD · legacy batch; original response hash unavailable · field: received_date

What changed

First retained observation; this does not establish that the application is new.

Legacy batch date (exact collection time unavailable): 21 May 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns Ballytobin , Co. Kilkenny , Ireland. Proposal excerpt: “We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construc…”

Location & nearby applications

Ballytobin , Co. Kilkenny , Ireland

No usable coordinates are available in the retained record, so a map pin is not shown.

Documents & sources

Kilkenny County Council · Reference 2660246

View council file →
Source records and verification details

Change record: NPAD · legacy batch; original response hash unavailable

Proposal: NPAD · legacy batch; original response hash unavailable

Latest source observation retained: 2026-05-21T00:00:00+00:00. Source dataset date: not supplied.

Full description from the council file
We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning.
Application details
Reference
2660246
Applicant
Art Generation Limited
Site address
Ballytobin, Co. Kilkenny, Ireland
Homes in source field
0 (proposal, not completions)
Reported floor area (m²)
0
Application type
PERMISSION
Latest reported outcome
Incompleted Application
Date received
April 24, 2026
Authority
Kilkenny County Council

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.