Planning near you · Dublin · Ref SD26B/0377W
Replacement of the existing hipped roof with a gable roof, with solar panels to the…
18, Berryfield, Finnstown Priory, Lucan, K78 EW70
Referral
- Applicant
- Not supplied in our sources
- Proposed use
- See council description
- Reported floor area
- 15.7 m²
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
- Application received
Source: NPAD
NPAD · legacy batch; original response hash unavailable · field: received_date
What changed
Updated in the retained record: Source status, Proposal description.
Compare the previous and updated values
Source status: Valid → Referral; Proposal description: The replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chimney to the front. Other works include a replacement porch canopy to the front entrance; modifications to window openings on the west-facing side gable, along with a new window; provision of a new window and a new ground floor door on the east-facing gable; external insulation to the front, sides and rear of the property; internal modifications to the existing house; external landscaping, including modifications to boundary walls and railings, widening the driveway entrance, a proposed shed; and miscellaneous other works. To the ground floor rear, the existing pitched roof kitchen will be demolished and a mono-pitch extension built to the rear / side. → Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chimney to the front; other works include a replacement porch canopy to the front entrance; modifications to window openings on the west-facing side gable, along with a new window; provision of a new window and a new ground floor door on the east-facing gable; external insulation to the front, sides and rear of the property; internal modifications to the existing house; external landscaping, including modifications to boundary walls and railings, widening the driveway entrance, a proposed shed and miscellaneous other works to the ground floor rear, the existing pitched roof kitchen will be demolished and a mono-pitch extension built to the rear / side.
Legacy batch date (exact collection time unavailable): 16 September 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns 18, Berryfield, Finnstown Priory, Lucan, K78 EW70. Proposal excerpt: “Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chimney to the front; other works include a replacement porch canopy to the front entrance; modificatio…”
Location & nearby applications
18, Berryfield, Finnstown Priory, Lucan, K78 EW70
No usable coordinates are available in the retained record, so a map pin is not shown.
Documents & sources
South Dublin County Council · Reference SD26B/0377W
View council file →Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.
Source records and verification details
Change record: NPAD · legacy batch; original response hash unavailable
Proposal: NPAD · legacy batch; original response hash unavailable
Latest source observation retained: 2026-09-16T00:00:00+00:00. Source dataset date: not supplied.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-09-16
- Source status: Valid → Referral
- Proposal description: The replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chimney to the front. Other works include a replacement porch canopy to the front entrance; modifications to window openings on the west-facing side gable, along with a new window; provision of a new window and a new ground floor door on the east-facing gable; external insulation to the front, sides and rear of the property; internal modifications to the existing house; external landscaping, including modifications to boundary walls and railings, widening the driveway entrance, a proposed shed; and miscellaneous other works. To the ground floor rear, the existing pitched roof kitchen will be demolished and a mono-pitch extension built to the rear / side. → Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chimney to the front; other works include a replacement porch canopy to the front entrance; modifications to window openings on the west-facing side gable, along with a new window; provision of a new window and a new ground floor door on the east-facing gable; external insulation to the front, sides and rear of the property; internal modifications to the existing house; external landscaping, including modifications to boundary walls and railings, widening the driveway entrance, a proposed shed and miscellaneous other works to the ground floor rear, the existing pitched roof kitchen will be demolished and a mono-pitch extension built to the rear / side.
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.