Search
localnews.ie

Irish local news and public records

Planning near you · Dublin · Ref WEB2302/26Sub01

4. The development shall comply with the following requirements of the Conservation…

27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest,, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure, (referred to as a former laun

Status unknown

Applicant
TC Fumbally Properties Ltd
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Grant recorded
    Source: Council portal

    Council portal · source SHA-256: 696f75e3394eec01d91dd2ac18e25fcfa507123d5acf990b6c58772e0dc18b25 · field: finalGrantDate

  2. Application registered
    Source: Council portal

    Council portal · source SHA-256: 696f75e3394eec01d91dd2ac18e25fcfa507123d5acf990b6c58772e0dc18b25 · field: registrationDate

What changed

First retained observation; this does not establish that the application is new.

Observed: 21 September 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns 27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest,, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure, (referred to as a former laun. Proposal excerpt: “4. The development shall comply with the following requirements of the Conservation Section: b) In advance of the respective associated work packages commencing on site, the applicant shall submit the following to the Pl…”

Location & nearby applications

27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest,, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure, (referred to as a former laun

No usable coordinates are available in the retained record, so a map pin is not shown.

Documents & sources

Dublin City Council · Reference WEB2302/26Sub01

View council file →

Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.

Source records and verification details

Change record: Council portal · source SHA-256: 696f75e3394eec01d91dd2ac18e25fcfa507123d5acf990b6c58772e0dc18b25

Proposal: Council portal · source SHA-256: 696f75e3394eec01d91dd2ac18e25fcfa507123d5acf990b6c58772e0dc18b25

Latest source observation retained: 2026-09-21T10:16:39.674389+00:00. Source dataset date: not supplied.

Full description from the council file
4. The development shall comply with the following requirements of the Conservation Section: b) In advance of the respective associated work packages commencing on site, the applicant shall submit the following to the Planning Authority, for their written agreement: i) Item 4 Portion of existing wall retained: Submit detailed description of the proposed consolidation, repointing and conservation repairs to the projecting wall remnant on New Row including Conservation Architect’s detailed methodology, specification for repointing, and 1:20 elevation drawings of the front back and side of the wall remnant. ii) Item 5 Existing windows to be lowered at 2nd and 3rd floor levels: The lowering of the cills shall be omitted (refer to CO report). The Applicant to submit 1:20 corrected elevation and section details through each of the bays retaining and repairing the existing wall fabric and window arrangements, where possible. The drawings shall indicate if the existing cills are natural stone, which should be retained and reinstated if they are sound, and replaced on a like-by-like basis if they are in poor condition. iii) Item 6 Retention of section of existing wall to be taken down and re-built: Submit Good-quality record photographs of the front and rear of the wall, prior to its dismantling, and photographs of where the wall fabric is stored pending reinstatement, and a detailed drawing and methodology of how the wall materials will be reconstructed and tied into the retained historic wall and new construction iv) Item 8 Metal coping to be installed instead of stone coping to parapet (former eaves) of Protected Structure: Submit 1:5 comparative details of a) the existing projecting brick detail at the top of the wall, b) a natural stone capping on top of the retained projecting brickwork, and
Application details
Reference
WEB2302/26Sub01
Applicant
TC Fumbally Properties Ltd
Site address
27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest,, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure, (referred to as a former laun
Decision due
November 03, 2026
Authority
Dublin City Council

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.