Recorded milestones for this application. A permission is not evidence that building work has started.
Grant recordedSource: Council portal
Council portal · source SHA-256: fb5a49309149c36075643c1ffaa612ebf2eba1f96ab5943fa16b5790a942628c · field: finalGrantDate
Application registeredSource: Council portal
Council portal · source SHA-256: fb5a49309149c36075643c1ffaa612ebf2eba1f96ab5943fa16b5790a942628c · field: registrationDate
What changed
First retained observation; this does not establish that the application is new.
Observed: 21 September 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns Cunningham House, Trinity Hall, Dartry, Dublin 6 D06 T263 (ABP-312539-22). Proposal excerpt: “5. The following requirements of the Conservation Officer shall be undertaken under the supervision and specification of an expert in architectural conservation and as such shall be confirmed in writing by that expert on…”
Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.
Source records and verification details
Change record: Council portal · source SHA-256: fb5a49309149c36075643c1ffaa612ebf2eba1f96ab5943fa16b5790a942628c
Proposal: Council portal · source SHA-256: fb5a49309149c36075643c1ffaa612ebf2eba1f96ab5943fa16b5790a942628c
Latest source observation retained: 2026-09-21T10:16:19.231042+00:00. Source dataset date: not supplied.
Full description from the council file
5. The following requirements of the Conservation Officer shall be undertaken under the supervision and specification of an expert in architectural conservation and as such shall be confirmed in writing by that expert on behalf of the applicant and submitted to the planning authority prior to the commencement of development:
(a) A conservation expert with proven and appropriate expertise shall be employed to design, manage, monitor and implement the works relating to the Protected Structures and to ensure adequate protection of the retained and historic fabric during the works. In this regard, all permitted works shall be designed to cause minimum interference to the retained buildings and facades, structure and or fabric.
(b) All works to the protected structures shall be carried out in accordance with best conservation practice and the Architectural Heritage Protection, Guidelines for Planning Authorities and Advice Series issued by the Department of Arts, Heritage and the Gaeltacht October 2011. Any repair works shall retain the maximum amount of surviving historic fabric in situ. Items to be removed for repair off-site shall be recorded prior to removal, catalogued and numbered to allow for authentic re-instatement.
(c) All existing original features, in the vicinity of the works shall be protected during the course of the refurbishment works.
(d) All repair of original fabric shall be scheduled and carried out by appropriately experienced conservators of historic fabric.
(e) The architectural detailing and materials in the new work shall be executed to the highest standards so as to complement the setting of the protected structures and their setting.
(f) The fabric from the historic boundary wall to the rear of Greenane shall be incorporated into the new landscaping works and or used in repair works to the historic boundary wall onto Temple Road, and that the applicant submits a drawing indicating where the fabric will be used.
Reason: To safeguard the special architectural interest of the protected structures.
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.