Search
localnews.ie

Irish local news and public records

Planning near you · Dublin · Ref LRD6025/23-S3Sub01

30. The construction of the development shall be managed in accordance with a final…

Old Bakery Site also known as 113, Phibsborough Road, Cross Guns Bridge, Phibsborough, Dublin 7, D07 XP46

Decision code: NON COMPLIANCE

Council decision recorded: September 08, 2026

Applicant
Bindford Limited
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Grant recorded
    Source: Council portal

    Council portal · source SHA-256: 59f2d8aa935a99c0a401e46f4a6d50d4289fcb2a90872a8a780426a7b408a960 · field: finalGrantDate

  2. Application registered
    Source: Council portal

    Council portal · source SHA-256: 59f2d8aa935a99c0a401e46f4a6d50d4289fcb2a90872a8a780426a7b408a960 · field: registrationDate

  3. Council decisionNON COMPLIANCE
    Source: Council portal

    Council portal · source SHA-256: 59f2d8aa935a99c0a401e46f4a6d50d4289fcb2a90872a8a780426a7b408a960 · field: decisionDate

What changed

First retained observation; this does not establish that the application is new.

Observed: 21 September 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns Old Bakery Site also known as 113, Phibsborough Road, Cross Guns Bridge, Phibsborough, Dublin 7, D07 XP46. Proposal excerpt: “30. The construction of the development shall be managed in accordance with a final project Construction and Environmental Management Plan, which shall be submitted to, and agreed in writing with, the planning authority …” Demolition is included in the proposal description.

Location & nearby applications

Old Bakery Site also known as 113, Phibsborough Road, Cross Guns Bridge, Phibsborough, Dublin 7, D07 XP46

No usable coordinates are available in the retained record, so a map pin is not shown.

Documents & sources

Dublin City Council · Reference LRD6025/23-S3Sub01

View council file →

Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.

Source records and verification details

Change record: Council portal · source SHA-256: 59f2d8aa935a99c0a401e46f4a6d50d4289fcb2a90872a8a780426a7b408a960

Proposal: Council portal · source SHA-256: 59f2d8aa935a99c0a401e46f4a6d50d4289fcb2a90872a8a780426a7b408a960

Latest source observation retained: 2026-09-21T10:12:45.559889+00:00. Source dataset date: not supplied.

Full description from the council file
30. The construction of the development shall be managed in accordance with a final project Construction and Environmental Management Plan, which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of the construction practice for the development, including: (a) Location of the site and materials compound(s), including areas identified for the storage of construction refuse; (b) Location and details of areas for construction site offices, staff facilities, site security fencing and hoardings; (c) Details of on-site car parking facilities for site workers during the course of construction; (d) Details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site; (e) Measures to obviate queuing of construction traffic on the adjoining road network; (f) Details of construction phase mobility strategy, incorporating onsite mobility provisions; (g) Measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network; (h) Alternative arrangements to be put in place for pedestrians, cyclists and vehicles in the case of the closure of any public road or footpath during the course of site development works; (i) Details of appropriate measures to mitigate vibration from construction activity in accordance with BS6472: 1992 Guide to Evaluation of Human Exposure to Vibration in Buildings (1Hz to 80Hz) and BS7385: Part 2 1990: Evaluation and Measurement for Vibration in Buildings - Guide to Damage Levels from Ground-Borne Vibration, and for the monitoring of such levels; (j) Details of appropriate mitigation measures for noise and dust, and monitoring of such levels; (k) Containment of all construction-related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater; (I) Off-site disposal of construction/demolition waste and details of how it is proposed to manage excavated soil: (m) Means to ensure that surface water run-off is controlled such that no silt or other pollutants enter local surface water sewers, watercourses or the canal, (n) A record of daily checks that the works are being undertaken in accordance with the final project Construction and Environmental Management Plan shall be kept for inspection by the planning authority; (o) An invasive species management plan. Reason: In the interest of amenities, public health and safety.
Application details
Reference
LRD6025/23-S3Sub01
Applicant
Bindford Limited
Site address
Old Bakery Site also known as 113, Phibsborough Road, Cross Guns Bridge, Phibsborough, Dublin 7, D07 XP46
Decision due
September 11, 2026
Council decision date
September 08, 2026
Authority
Dublin City Council

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.