localnews.ie

Planning near you · Cork · Ref 2442889

The change of use of the first floor of Unit 7, The Plaza, City Square, Watercourse Road…

First Floor of Unit 7 The Plaza City Square Wat, Blackpool Co. Cork T23 X8PC & the ground and first, 44 Watercourse Road Blackpool

Final grant

Council decision recorded: April 15, 2025

Applicant
Not supplied in our sources
Proposed use
See council description

The story so far

Application timeline

Recorded milestones for this application. A permission is not evidence that building work has started.

  1. Application received
    Source: retained record

    Council record · legacy batch; original response hash unavailable · field: received_date

  2. Council decisionGranted with conditions
    Source: retained record

    Council record · legacy batch; original response hash unavailable · field: decision_date

  3. Grant recorded
    Source: retained record

    Council record · legacy batch; original response hash unavailable · field: _grant_date

What changed

First retained observation; this does not establish that the application is new.

Legacy batch date (exact collection time unavailable): 25 October 2026. This describes our archive, not an application event date.

Why it matters locally

The proposal concerns First Floor of Unit 7 The Plaza City Square Wat , Blackpool Co. Cork T23X8PC & the ground and first , 44 Watercourse Road Blackpool. Proposal excerpt: “The change of use of the first floor of Unit 7, The Plaza, City Square, Watercourse Road, Blackpool, Cork from commercial to residential use to provide 1 no. x studio apartment, 3 no. x1 bedroom apartments and 2 no. x 2 …”

The source records zero homes despite housing wording. Do not use this as a verified housing total.

Location & nearby applications

First Floor of Unit 7 The Plaza City Square Wat , Blackpool Co. Cork T23X8PC & the ground and first , 44 Watercourse Road Blackpool

The marker is the source location, not the site boundary. Open larger map · Map © OpenStreetMap contributors.

No other mapped applications within 5 km were found in the records available for this page.

Documents & sources

Cork City Council · Reference 2442889

View council file →

Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.

Source records and verification details

Change record: Council record · legacy batch; original response hash unavailable

Proposal: Council record · legacy batch; original response hash unavailable

Latest source observation retained: 2026-10-25T15:50:25.586219+00:00. Source dataset date: 2026-10-20.

Full description from the council file
The change of use of the first floor of Unit 7, The Plaza, City Square, Watercourse Road, Blackpool, Cork from commercial to residential use to provide 1 no. x studio apartment, 3 no. x1 bedroom apartments and 2 no. x 2 bedroom apartments. The change of use from commercial to residential use of the ground and first floors of 44 Watercourse Road, Blackpool, Cork to provide 2 no. x studio apartments, 5 no. x1 bedroom apartments. The Proposed Development also includes: (A) The refurbishment of existing stairs, construction of new exterior access stairs from ground to first floor and the construction of new ramp from lower ground floor to ground floor level, the construction of balconies and replacement and installation of windows at the eastern, western and northern building elevations, minor alterations and all associated site development works at the first floor of Unit 7, The Plaza City Square, Watercourse Road, Blackpool, Cork; and (B) The installation of windows at the southern and western elevation and the replacement of windows on all elevations. The construction of a single balcony on the first floor at the western elevation. Installation of skylights. Refurbishment of existing stairs and the provision of cycle parking area, minor alterations and all associated site development works
Application details
Reference
2442889
Site address
First Floor of Unit 7 The Plaza City Square Wat, Blackpool Co. Cork T23 X8PC & the ground and first, 44 Watercourse Road Blackpool
Homes in source field
0 (proposal, not completions)
Reported floor area (m²)
0
Application type
PERMISSION
Latest reported outcome
Final grant
Date received
April 26, 2024
Decision due
April 16, 2025
Council decision date
April 15, 2025
Authority
Cork City Council

Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.