First retained observation; this does not establish that the application is new.
Observed: 23 September 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27. Proposal excerpt: “the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of cir…” Demolition is included in the proposal description.
Location & nearby applications
Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27
the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage
and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa
(ca). 11.2 hectare (ha.). The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of
ca. 27 metres above Ordnance Datum (mAOD) with either:
1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge
spoil which will result in the proposed development operating as a soil recovery facility that requires a waste
management licence from the Environmental Protection Agency (EPA); or
2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be
notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product
material to enable the site to be backfilled.
The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste
management licence from the EPA. The development will also comprise of the construction of an inspection shed
(ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing
infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The
development will also include junction improvement works at the L7648 / N25 junction, located ca. 120m north
of the quarry entrance. The application relates to development which involves an activity requiring a waste
licence from the EPA.
A planning permission of 20 years is being sought for the proposed development. An Environmental Impact
Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority
with the application. The planning application, Environmental Impact Assessment Report (EIAR) and Natura
Impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a
copy at the offices of the Planning Authority, County Hall, Carrigrohane Road, Cork, during its public opening
hours of 9.00am to 4.00pm, Monday to Friday (excluding public holidays). A submission or observation in
relation to the application, EIAR and/or NIS may be made in writing to the Planning Authority on payment of
the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the
application, and such submissions and observations will be considered by the planning authority in making a
decision on the application. The planning authority may grant permission subject to or without conditions or
may refuse to grant permission.
Application details
Reference
26/2426
Site address
Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27
Application type
Permission
Latest reported outcome
Awaiting Technical Validation
Date received
September 17, 2026
Decision due
November 11, 2026
Authority
Cork County Council
Source: local authorities / National Planning Applications. Contains Irish Public Sector Data licensed under CC BY 4.0 where supplied by NPAD. Linked documents may have separate reuse terms.