Planning near you · Cork · Ref 26/2133
We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for…
Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen, Cornaveigh,, Cork, Ireland
Awaiting Recommendation
- Applicant
- Not supplied in our sources
- Proposed use
- See council description
The story so far
Application timeline
Recorded milestones for this application. A permission is not evidence that building work has started.
- Application received
Source: NPAD
NPAD · legacy batch; original response hash unavailable · field: received_date
What changed
Updated in the retained record: Source status, Proposal description.
Compare the previous and updated values
Source status: Awaiting Admin Validation → Awaiting Recommendation; Proposal description: We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Gri → We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Grid
Legacy batch date (exact collection time unavailable): 2 September 2026. This describes our archive, not an application event date.
Why it matters locally
The proposal concerns Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen, Cornaveigh,, Cork, Ireland. Proposal excerpt: “We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The deve…”
Location & nearby applications
Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen, Cornaveigh,, Cork, Ireland
No usable coordinates are available in the retained record, so a map pin is not shown.
Documents & sources
Cork County Council · Reference 26/2133
View council file →Individual document links are not available in this retained record. Use the council file for the available drawings, reports and decisions.
Source records and verification details
Change record: NPAD · legacy batch; original response hash unavailable
Proposal: NPAD · legacy batch; original response hash unavailable
Latest source observation retained: 2026-09-06T00:00:00+00:00. Source dataset date: not supplied.
Full description from the council file
Application details
All recorded updates to this application
Dates below show when a change was first retained, not when a planning event happened.
- 2026-09-02
- Source status: Awaiting Admin Validation → Awaiting Recommendation
- Proposal description: We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Gri → We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Grid