2026-08-06CONSTRUCTION OF EXTENSION TO EXISTING DWELLING AND (2) MINOR ELEVATION CHANGES, CONNECTION…
2026-08-06MINOR ALTERATIONS TO THE FRONT ELEVATION OF HOUSE INCLUDING REPLACEMENT OF PAIR OF WINDOWS…
2026-08-05Planning conditional: CONSTRUCTION OF A DWELLING HOUSE AND DETACHED DOMESTIC GARAGE, INSTALLATION OF SEPTIC TANK / SEWAGE TREATMENT SYSTEM...
2026-08-05Planning conditional: CHANGE OF USE FROM DWELLING TO 2 NO. APARTMENTS INCORPORATING A 2 STOREY EXTENSION TO REAR OF EXISTING BUILDING WITH...
2026-08-05Planning conditional: CONSTRUCTION OF A 1.5 STOREY DWELLING HOUSE AND GARAGE, PROVISION OF A SEWAGE TREATMENT SYSTEM, ACCESS VIA A NEW...
2026-08-05Planning conditional: (1) CHANGE OF USE OF EXISTING STABLES TO A TAPROOM, (2) ERECTION OF AN EXTENSION TO THE FRONT AND REAR OF EXISTING...
2026-08-05Planning conditional: CONSTRUCTION OF A DWELLING HOUSE AND DETACHED DOMESTIC GARAGE WITH SEPTIC TANK AND PERCOLATION AREA AND ALL...
2026-08-05Planning conditional: CHANGE OF USE OF EXISTING WAREHOUSE BUILDING TO 6NO. APARTMENTS (4NO. FOR LONG TERM LETTING AND 2NO. FOR SHORT TERM...
2026-08-05Planning conditional: PLACEMENT OF A MOBILE HOME STRUCTURE FOR USE AS TEMPORARY ACCOMMODATION FOR THE DURATION OF RENOVATION WORKS...
2026-08-05Planning conditional: CONSTRUCTION OF (1) DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND (2) GARAGE/STORE TO...
2026-08-05Planning conditional: CONSTRUCTION OF 17 NO. DWELLING HOUSES (2 & 3 BEDS), ACCESS VIA R245 THROUGH THE EXISTING MULROY PARK HOUSING...
2026-08-05Planning conditional: CONSTRUCTION OF A GREEN GRADING FACILITY WHICH WILL PROVIDE STORAGE OF FISHING EQUIPMENT, NETS, POTS, BUOYS AND...
2026-08-05Planning application received: (1) PROVISION OF 6NO. 21M HIGH POLES WITH LED FLOODLIGHTING TO THE MAIN / TRAINING PITCHES INCLUDING...
2026-08-05Planning application received: A PERIOD OF 10 YEARS FOR A LARGE-SCALE RESIDENTIAL DEVELOPMENT (LRD) CONSISTING OF THE FOLLOWING: (1
2026-08-05Planning conditional: ERECTION OF DWELLING AND DOMESTIC GARAGE AND INSTALLATION OF WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED SITE WORKS
2026-08-05RENOVATION AND REFURBISHMENT OF DERELICT SHED ATTACHED TO SIDE OF DWELLING HOUSE STRUCTURE…