Search
localnews.ie

Irish local news and public records

Latest updates for Tramore

Source cards as of 2026-09-16.

News

Browse news archive

Planning

Browse planning archive

Latest by Date

26 Aug 2026 latest
  1. planningPlanning application received: solar energy development to erect 292.32 kWp of photovoltaic panels on ground...
  2. planningPlanning application received: to construct a single storey side extension to provide master bedroom ensuite...
  3. planningPlanning conditional: is sought for the as built alterations to planning file 17262 consisting of: the...
  4. planningPlanning application received: for erection of timber framed modular dwelling and all associated site works...
  5. planningPlanning application received: for a proposed new Kiosk inclusive of Motor Control Centre and welfare...
  6. planningPlanning application received: to construct a slatted tank and all associated site works
  7. planningPlanning application received: development will consist of demolition of existing supermarket with ancillary...
  8. planningPlanning application received: to construct a slatted tank and all associated site works
  9. planningPlanning application received: of single storey bathroom extension to east side, extended sunroom, first...
  10. planningPlanning application received: to construct a single storey side extension to existing property
  11. planningPlanning application received: to provide rear gardens to house no’s 1-20 inclusive in place of communal...
  12. planningPlanning application received: indefinite retention of as built single storey garage and outhouse buildings...

Planning

35 stories

Planning application received: solar energy development to erect 292.32 kWp of photovoltaic panels on ground mounted steel frames with all associated s

Applicant — Matthewstown , Fenor Tramore , Co. Waterford. solar energy development to erect 292.32 kWp of photovoltaic panels on ground mounted steel frames with all associated site works. The application relates to “relevant solar energy development” RED III development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413).

File ref: 2660648 · Waterford City and County Council
26 Aug 2026 · Waterford City and County Council (Planning)

Planning application received: for erection of timber framed modular dwelling and all associated site works including connection to existing wastewater

Applicant — Knockenduff , Tramore , Co. Waterford. for erection of timber framed modular dwelling and all associated site works including connection to existing wastewater treatment plant at rear of existing dwelling.

File ref: 2683 · Waterford City and County Council
21 Aug 2026 · Waterford City and County Council (Planning)

Planning conditional: is sought for the as built alterations to planning file 17262 consisting of: the omission of the first floor rear terrac

Applicant — 15a Main Street , Tramore , Co. Waterford. is sought for the as built alterations to planning file 17262 consisting of: the omission of the first floor rear terrace, construction of a rear external stairs and relocation of first floor rear door with dormer overhead. PERMISSION is sought for the extension and alterations to the existing first floor 1-bedroom apartment to a new…

File ref: 2660148 · Waterford City and County Council
21 Aug 2026 · Waterford City and County Council (Planning)

Planning application received: for a proposed new Kiosk inclusive of Motor Control Centre and welfare section, new Wash-Water Booster Kiosk and all ass

Applicant — Tramore wastewater treatment plant and pumping station , The Estuary Crobally Upper , Tramore. for a proposed new Kiosk inclusive of Motor Control Centre and welfare section, new Wash-Water Booster Kiosk and all associated ancillary development including hardstanding, and landscaping, located within the existing Tramore wastewater treatment plant and pumping station.

File ref: 2660634 · Waterford City and County Council
20 Aug 2026 · Waterford City and County Council (Planning)

Planning application received: development will consist of demolition of existing supermarket with ancillary off-licence (1711sqm) and construction of

Applicant — Tramore Rd , Priorsknock , Waterford. development will consist of demolition of existing supermarket with ancillary off-licence (1711sqm) and construction of a new supermarket with ancillary off-licence (2571.8sqm) and reconfiguration of car parking to include 77no. car parking spaces (in lieu of 126no. existing car parking spaces) with access from existing vehicular access from R675…

File ref: 2660625 · Waterford City and County Council
18 Aug 2026 · Waterford City and County Council (Planning)

Planning application received: of single storey bathroom extension to east side, extended sunroom, first floor sliding door and balcony area at rear, e

Applicant — Doneraile Cottage , Church Road , Tramore. of single storey bathroom extension to east side, extended sunroom, first floor sliding door and balcony area at rear, extended first floor bedroom over passage beneath to west side, altered elevations, including slate cladding to first floor external walls and blocking up of one window at front, all as constructed.

File ref: 2660606 · Waterford City and County Council
12 Aug 2026 · Waterford City and County Council (Planning)

Planning application received: to provide rear gardens to house no’s 1-20 inclusive in place of communal open space indicated on planning permission re

Applicant — Harmony Heights , Newtown , Tramore. to provide rear gardens to house no’s 1-20 inclusive in place of communal open space indicated on planning permission ref no. 21/1213 and ABP-314132-22 for 20 independent living residential units consisting of 4 no. one bed end of terrace bungalows, 14 no. two bedroom terrace bungalows and 2 no. two bed end of terrace bungalows

File ref: 2660596 · Waterford City and County Council
10 Aug 2026 · Waterford City and County Council (Planning)

+23 older planning stories →